Projects
Please, understand that due to client protection the project list below is anonymous. Feel free to contact me if you are interested in further information on a particular project. This list represents only a part of my projects.
|
2020 - 2021 |
Branch: |
Power Supply |
Client: |
Nationwide acting power supplyer |
Project: |
I design and implement a Records Management System. |
Topics: |
analysis, conception, implementation, records management |
|
2016 - 2022 |
Branch: |
Public Sector |
Client: |
International institution for the supervision of financial institutions |
Project: |
I coordinate, design and introduce the integration of a document management and a records management system with a data-leading ERP system. I envisage a solution strategy and provide a coaching for the simplification and optimization of the solution. |
Topics: |
analysis, consulting, document management, implementation, OpenText, project managment, records management, requirements engineering, SAP |
|
2007 - 2008 |
Branch: |
Transport & Logistics |
Client: |
The world's biggest logistics company. |
Project: |
I implemented a companywide document management and knowledge management system through analysis, design, configuration of the system, co-ordination of all project activities during the phase of implementation and coordinatied the functional operations. |
Topics: |
analysis, conception, consulting, document management, implementation, OpenText |
|
2006 - 2007 |
Branch: |
Public Sector |
Client: |
An international institution for the supervision of finances. |
Project: |
I advised the client in the implementation of a document management and a records management system. The project included designing, implementing and controlling the quality of the system. |
Topics: |
analysis, conception, consulting, document management, implementation, OpenText, records management |
|
2005 |
Branch: |
Industrial Sector |
Client: |
A leading company for installation technology |
Project: |
I designed, implemented an led the project of introducing a document management system. |
Topics: |
conception, consulting, document management, implementation, OpenText |
|
2004 - 2005 |
Branch: |
Pharmaceutical Sector |
Client: |
A global pharmaceutical company. |
Project: |
I acted as a project leader for the implementation of workflows and process automization on the basis of Livelink. |
Topics: |
conception, consulting, implementation, OpenText, project managment |
|
2004 |
Branch: |
Financial Sector |
Client: |
A German company concerned with finance, banking, loans and investments. |
Project: |
Implementation of a document management system, consulting, design, project leading, implementation and quality control. |
Topics: |
analysis, conception, consulting, document management, implementation, OpenText, project managment |
|
2000 - 2009 |
Branch: |
Financial Sector |
Client: |
One of the biggest German savings banks. |
Project: |
Implementation of a web content management system for the organisation's website and intranet. |
Topics: |
analysis, conception, consulting, document management, implementation, product selection, web content management |
|
2000 - 2006 |
Branch: |
Insurance Sector |
Client: |
The German roof organisation of public insurers. |
Project: |
Implementation of a web content management system for the organisation's website. |
Topics: |
analysis, conception, consulting, implementation, web content management |